Colas Rail teams will also install the power supply and help build the track and signaling. Designed to facilitate travel in the area, Line 4 will be a major transport route that will provide new connections and help reduce road traffic, to the benefit of local residents and tourists, alike.Īs consortium leader, Colas Rail will oversee system integration and overall coordination of the project. The 19-km section will include 16 stations serving the new Grand Egyptian Museum and the Gizah pyramids. The new Cairo metro line 4 will connect the Hadayek El Ashgar station in 6th of October City, to the Malek El Saleh station in New Cairo. The consortium will be in charge of rail systems, track and depots for a total contract value of €650 million, of which €159 million for Colas Rail. This project was awarded by the Egyptian National Authority for Tunnels (NAT). Colas Rail, the railway subsidiary of Colas, as leader of a consortium with Orascom Construction and Thales, has signed a contract with Mitsubishi Corporation for the construction of the first phase of line 4 of the Cairo, Egypt metro.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |